Sokoto-Badagry Highway Reaches Silame-Katami Corridor

PROJECT UPDATE: Sokoto–Badagry Super HighwaySilame–Katami Corridor – Steady & Strategic ProgressFull
clearance achieved from Illela through Silame LGA in Sokoto State — a major milestone unlocked.
Works now advancing toward the Kebbi State border, with contractors fully mobilized for alignment preparation and preliminary construction.
This vital link will bridge Sokoto and Kebbi States within Nigeria’s flagship 1,068 km transnational corridor — connecting the Northwest to the Southwest and unlocking massive economic potential.
Using advanced techniques like Continuously Reinforced Concrete Pavement (CRCP), the project delivers durability, safety, and long-term value.Progress is measurable, momentum is strong — delivering renewed hope through world-class infrastructure.
Inspected under the leadership of:
Sokoto State Controller, FMW — Engr. Kasim Maigwandu Reported by:
Sokoto State Field Supervisors: Habibu Bello Mayana & Sagir Usman